A proposed AI data centre in north-west Tasmania plans to cool its facilities using water that it trucks in.
https://www.abc.net.au/news/2026-08-27/firmus-truck-water-rainwater-cool-wesley-vale-ai-data-centre/1070832305
3
3
u/Accurate_Ad_3233 Aug 28 '26
Trucks in from where? And what about the power usage? And has anyone figured out yet WHY 'we' need this monstrosities?
3
u/louisa1925 Aug 28 '26
It will be used to governmentally stalk people. Though I do hope it does get used in more appropriate ways. I don't really see why we need them.
1
u/Accurate_Ad_3233 Aug 28 '26
No I think you were right the first time. :)
https://goldenorder.substack.com/p/ai-data-centers-the-real-reason-theyre
1
u/yolk3d Aug 28 '26
“Golden Order” sounds like a conspiracy blogger.
1
u/Accurate_Ad_3233 Aug 28 '26
So when you read the article which of the facts do you think were incorrect?
2
u/yolk3d Aug 28 '26
Author is very “my thesis”, “my read”. Facts mostly check out, conclusion doesn’t follow. He says himself it’s his own read, not something he can source. The core argument is that surveillance needs compute and data centres are compute. So does Netflix. The drone quote is just an investor asking how you protect a $75 billion asset from sabotage. Pension money funds every big buildout, that’s what pension funds do. The World Bank publishes its digital ID work openly, and his own footnote links to it. The Nazi and Reichstag material proves nothing, and he cites a document he admits might be satire. He also skips the obvious explanation: it’s a capex race between a few tech giants, possibly a bubble. The real issues are water, power bills, tax breaks and rushed zoning.
1
u/Accurate_Ad_3233 Aug 28 '26
OK so he was upfront about everything including that his conclusion was just his opinion based on current evidence. You should have led with that. :)
1
u/yolk3d Aug 28 '26
And you should have not used someone opinion piece as evidence that data centres will be “used to governmentally stalk people”. And my initial comment was just that the bloggers substack blog title sounded like a conspiracy theory blogger. Don’t strawman.
1
u/Accurate_Ad_3233 Aug 28 '26
And do you have a better explanation for the current global rollout of these things?
1
u/yolk3d Aug 28 '26
Yeah: companies think AI is the next platform and are terrified of being the one that underinvested. That’s it. Nvidia’s revenue, the hyperscaler capex reports and the debt they’re raising are all public, and a lot of people think it’s a bubble. That explains the speed better than a conspiracy plan does, because a plan wouldn’t be this wasteful or this publicly financed.
Also I don’t need a better explanation. You made the claim, the burden’s yours.
→ More replies (0)1
0
u/f1na1 Aug 29 '26 edited Aug 29 '26
Because reddit and every google search you do is run at a data centre
4
u/Flamesake Aug 29 '26 edited Aug 29 '26
Funny, reddit and Google seemed to be working just fine before the huge push in the last few years to build out so many more data centres.
1
2
1
u/n2o_spark Aug 28 '26
I thought initial conversation around cooling was a closed loop system. But it's starting to sound like a combination closed and evap type? I think if they can't survive on rainwater alone, they need to re-evaluate their cooling options.
1
u/yolk3d Aug 28 '26
Literally none of you read the article.
The company wrote that because there was no TasWater connection to the site, it planned to use rainwater and water from state-owned company Tasmanian Irrigation.
Tasmanian Irrigation supplies water to agricultural users and said at the time it could not legally provide water to data centres.
The development application shows Firmus now plans to use rainwater and water delivered by truck.
"We expect the trucking option to be needed only in extreme dry periods," the application states.

The biggest water requirement is for cooling, which Firmus states will only be required on days when the temperature exceeds 26 degrees Celsius.
1
u/Ergomann Aug 29 '26
Somehow they have trades and money to build data centres but not housing? Weird
8
u/Direct_Substance8317 Aug 28 '26
If it is a closed loop system they will truck it in and then just top it up with treated tap water. No biggie. Power may be a different issue.